Differences between revisions 4 and 5
Revision 4 as of 2008-10-10 00:45:39
Size: 1424
Editor: AlexPico
Comment:
Revision 5 as of 2008-10-10 00:48:04
Size: 1528
Editor: AlexPico
Comment:
Deletions are marked like this. Additions are marked like this.
Line 9: Line 9:
 * Transportation: There is the [http://transit.511.org/schedules/index.aspx#m1=S&m2=rail&routeid=26606&cid=SF K/T-line train] that connects downtown SF to the campus (takes ~20min)  * Transportation: You can take [http://www.bart.gov/guide/airport/inbound_sfo.aspx BART] to and from the SFO airport. And there is the [http://transit.511.org/schedules/index.aspx#m1=S&m2=rail&routeid=26606&cid=SF K/T-line train] that connects downtown SF to the campus (takes ~20min)

Mini-Retreat Two

  • November 14-15, 2008
  • Genentech Hall, 4th floor, UCSF Mission Bay, San Francisco
  • Alex's cell: 415-328-3967

Logistics

Topics for Discussion

  • TBA

Goal

Pre-meeting Comments

Meeting Notes

Outdated_Cytoscape_3.0/MiniRetreatTwo (last edited 2011-02-24 15:40:08 by PietMolenaar)

Funding for Cytoscape is provided by a federal grant from the U.S. National Institute of General Medical Sciences (NIGMS) of the Na tional Institutes of Health (NIH) under award number GM070743-01. Corporate funding is provided through a contract from Unilever PLC.

MoinMoin Appliance - Powered by TurnKey Linux