Line 3: Line 3:
The original project proposal is still available at DanielAbel/GoogleSummerofCode2008. The original project proposal is available at DanielAbel/GoogleSummerofCode2008.

Progress can also be tracked on the [http://daniel-abel.blogspot.com/ blog].

Current state of DanielAbel's GSoC project.

The original project proposal is available at DanielAbel/GoogleSummerofCode2008.

Progress can also be tracked on the [http://daniel-abel.blogspot.com/ blog].

Timeline / TODO list

Before coding period:

  • get svn account, checkout code, etc.
  • wait for merge of cytoscape 2.6 to cytoscape 3.0 branch

During coding period:

  • implement edge directionality, backend (one week)
  • implement gui/plugins part of undirected edges (vizmapper, TableImport, etc.) (one week)

  • implement local attributes, backend part (one week)
  • implement gui/plugins part of local attributes (vizmapper, core plugins, etc.) (two weeks)
  • work on flexible line types