← Revision 3 as of 2007-05-25 16:32:21
374
Comment:
|
← Revision 4 as of 2007-05-25 16:34:23 →
361
|
Deletions are marked like this. | Additions are marked like this. |
Line 14: | Line 14: |
* CPM (Critical Path Method) | * Critical Path |
Release 2.6 Use Cases / Overall Themes
- Under construction...
Timeline
Release Date: TBD
Release 2.6 Feature Ideas (tentative)
- Consolidated basic graph operations/analysis tool
- Shortest path
- All Path between two nodes
- Binary operations (union, intersection, difference)
- Critical Path
- ...