Differences between revisions 64 and 65
Revision 64 as of 2007-06-07 16:06:49
Size: 3431
Editor: KeiichiroOno
Comment:
Revision 65 as of 2007-06-07 18:19:48
Size: 3410
Editor: nebbiolo
Comment:
Deletions are marked like this. Additions are marked like this.
Line 8: Line 8:
Release Date: '''''July 1, 2007''''' Release Date: '''''July 16, 2007'''''
Line 16: Line 16:
||Document Event Handling (preliminary work to event handling refactoring, write Doclets) ||Everyone || || || ||
Line 28: Line 27:
||["Layers / Annotation / UI for custom nodes"] ||UCSF - Alex, Agilent - Allan K, MSKCC - Ben ||TBD (requires further study of renderer) ||some initial functionality implemented, and utilized in bubble router prototype ||Planning for 2.6 ||
Line 35: Line 33:
||["Layers / Annotation / UI for custom nodes"] ||UCSF - Alex, Agilent - Allan K, MSKCC - Ben ||TBD (requires further study of renderer) ||some initial functionality implemented, and utilized in bubble router prototype ||
||Document Event Handling (preliminary work to event handling refactoring, write Doclets) ||Everyone || || ||

TableOfContents

Release 2.5 Use Cases / Overall Themes

  1. Pathway / Annnotation
  2. Usability
  3. Navigation / Find

Timeline

Release Date: July 16, 2007

Release 2.5 Features

TODO

Name

Lead Group

Time Required

Status

Remaining Development Time

Layout Manager / Broker

UCSF - Scooter

checked in/awaiting feedback

testing

Groups (formerly known as metanodes)

UCSF, Agilent

Completed API and two client plugins (namedSelectionPlugin, metanodePlugin2)

testing

Hyperedges

Agilent

1-2 weeks

finalizing documentation, testing

["VizMapUI"] Redesign

UCSD - Kei

testing/compatibility test/backend cleaning.

tuning and testing. JUnit/Swing-unit tests are required.

Plugin Website

UCSD - Peng

10 weeks

Test site is at http://cytoscape.org/plugins25/index.php

Finished

Automatic Plugin Download

ISB - Sarah

PluginManager API and dialog code in place, writing documentation

testing

Create cytoscape-helpdesk

UCSD - Peng

2 weeks

FAQ is in progress

Peformance (speed + memory) profiling

UCSD - Mike, AMC - Piet

1 week

Framework complete, just need to add a few more events

1 week

Pathway Commons Connectivity

MSKCC, Gary

ETA, May 7.

Plugin and webservices API in progress.

1.5 weeks

["Filters UI Redesign"]

MSKCC - Ethan, UCSD - Mike, Peng

7 weeks

Implementation is in progress

1 week

Library Reduction / Cleanup

ISB - Sarah

1 week

ongoing

finished

Testing

AMC - Piet, Pasteur - Tero

1 week

Undo Manager

AMC - Piet, UCSD - Mike

Checked in/awaiting feedback

testing

Interactive Layout (Bubble, Snap-To)

UCSF - Alex, Agilent - Allan K, MSKCC - Ben

1-2 weeks

bubble-router mostly implemented, nearing internal release to core developers

Plan to release as plugin with 2.5

Papers

Everyone

Bug Fixing

Everyone

Remove Deprecation Warnings

Everyone

ongoing

ongoing

Postponed

Name

Lead Group

Time Required

Status

Tutorials

Unassigned

["Layers / Annotation / UI for custom nodes"]

UCSF - Alex, Agilent - Allan K, MSKCC - Ben

TBD (requires further study of renderer)

some initial functionality implemented, and utilized in bubble router prototype

Document Event Handling (preliminary work to event handling refactoring, write Doclets)

Everyone

Usability Assessment

Pasteur, ISB - Sarah

ongoing

ongoing

Web Services / Database Connectivity Guidelines

ISB - Sarah, UCSF - Alex

RFC started, discussions ongoing

ongoing - Planning for 2.6

Linkout from Attribute Browser

UCSD - Kei

1-2 weeks

Prototype is already there, but need to integrate it with Linkout plugin.

Custom Node / Edge Graphics (MIMS)

UCSF - Alex, Agilent - Allan K, MSKCC - Ben

Cytoscape Class Cleanup

MSKCC - Ethan

Combining Attributes / Formulas

MSKCC - Ethan, UCSF - Scooter, Alex

GINY Refactoring

UCSD - Mike

Properties / XML Config

UCSD,UCSF - Scooter

1 month (? Depends on the goal)

Planning

CyAttributes Name Clashes

MSKCC - Ethan

Lower priority; will be completed if there is time, after Pathway Commons and Filters.


Cytoscape_2.5 (last edited 2009-02-12 01:03:34 by localhost)